Gary says:
The building is moving along well:
-we have windows installed
-the building is confirmed to be water-tight by next week
-Pink Batts are onsite and ready for installation
-Electrics have been installed
-Plumbing has been installed
-Security wiring will be installed this week
-Have been told the GIB will arrive this week and fixed once the wiring has been completed
We have come along way and have been confirmed we are on track to a July opening date. There is a lot happening in the background to make sure the Medical Centre is achieving the character and level of confidence the team is anticipating and aiming for.
We have received a number of manual Pre-Enrolment forms and processed them into our system ready for when we push the “GO” button to make them live. We are awaiting the go ahead for our ONLINE Enrolment form to go live – hopefully this will be available in the next couple of weeks. This will streamline things better and make it easier for those wanting to enrol wth us.
Gary would like to commend the builders - they are an amazing team of workers and are a credit to Wayne Bishop Group. All we can do now is sit back and let them do their work. 6-8 weeks to go.